West Texas Oil Reports

Keeping Companies Compliant since 1948


Flare/Vent Gas


We offer services in filing an Exception to Statewide Rule 32 as required (see requirements below).

The Commission's Statewide Rule 32 allows an operator to flare gas while drilling a well and for up to 10 days after a well’s completion for operators to conduct well potential testing. The majority of flaring permit requests received by the Commission are for flaring cashinghead gas from oil wells. Permits to flare from gas wells are not typically issued as natural gas is the main product of a gas well.

Flaring of casinghead gas for extended periods of time may be necessary if the well is drilled in areas new to exploration. In new areas of exploration, pipeline connections are not typically constructed until after a well is completed and a determination is made about the well's productive capability. Other reasons for flaring include: gas plant shutdowns; repairing a compressor or gas line or well; or other maintenance. In existing production areas, flaring also may be necessary because existing pipelines may have no more capacity. Commission staff issue flare permits for 45 days at a time, for a maximum limit of 180 days.